Successful projects

Reliability, quality and technical know-how – this characterizes our project work. Convince yourself, through selected references, of our capability as a partner for your needs.

Foto1

Slopestyle Course – Olimpics Milano Cortina 2026

In a record time of 2 months, the materials for the final section of the slopestyle course in Livigno (SO) were delivered and set up.

Our PANADECK ceiling formwork was used, along with the high-load aluminium props and the PT80 stacking towers, which were able to support snow loads of up to 6 m.

Medoina Biogas plant
Castello di Fiemme (TN)

For the Medoina biogas plant, 2 round tanks with a diameter of 20 m and a height of 9 m were shuttered with PANAWALL Round. Also, 1 smaller tank with a diameter of 10 m and a total height of 4.5 m.

_DR54462_4B
Brücke

Bridge – technical monument
Liblín in the Pilsen region (CZ).

The bridge in the municipality of Liblín in the Pilsen region is an important technical monument and at the same time an important road structure over the Berounka River. The original bridge structure was mostly dismatled, and the substructure was rebuilt. The piers on the arch were concreted with our framed formwork PANAWALL.

Wooden roller coaster
Amusement park Mirakulum – Milovice (CZ)

The first wooden roller coaster of this kind was built at the Mirakulum amusement park. Based on geotechnical data, three types of foundations were designed for this attraction. The foundations were poured using the PANAWALL wall formwork, and the tunnel-like parts of the substructure were done with the PANADECK slab formwork.

DCIM100GOPROGOPR1422.JPG
hochhaus-bozen-schlachthofstrasse

New skyscraper
Bozen (BZ)

The building consists of fourteen floors, eleven above ground level and three underground, two of which are used as a garage.

For the construction of this building, the PANAWALL wall formwork and the PANAWALL Round circular formwork were used.

Construction of a building and a warehouse
in Schrambach (BZ)

The ceiling height is over 6 m and was constructed with a 50 cm thick solid concrete slab.

The first slab was poured in three casting phases, each covering at least 1,000 m². It was done using our PANADECK slab formwork in combination with the PT80 shoring towers.

buerogebaeude-halle-schrambach
speicherbecken-wolkenstein

Reservoir
Wolkenstein (BZ)

A storage basin for the Plan de Gralba snowmaking system was built. With the help of our PANACOLUMN formwork, the room height of over 8 m could be achieved.

5 star hotel
Salò (BS)

For this residential construction project, our PANAWALL & PANAWALL Plus wall formwork as the slab formwork PANADECK with shoring towers PT80 were used.

 

DJI_20241113091012_0010_D_FILE[1]
1000170654

Water Barrier
on the river in Sexten (BZ)

Construction of a water barrier on the river in Sexten. The total height of the barrier is 12 m with a wall thickness of 1.5 m. The work was carried out using the PANAWALL wall formwork. The customer was extremely satisfied with our climbing console.

Panalex-Baustelle-Bozen-2.2.WEB_.©-Alfred-Tschager-004-062-mobile
Panalex-Baustelle-Bozen-2.2.WEB_.©-Alfred-Tschager-004-062-scaled

Trust PANALEX®

With decades of experience, a strong team and cutting-edge production technologies, we set standards in the construction industry. Together, we shape the future – with well-designed formwork solutions that meet the highest requirements.